FREE Shipping on All products within the U.S.! Additional charges may apply for remote areas. Enjoy free installation with Local Pickup!

FREE Shipping on All products within the U.S.! Additional charges may apply for remote areas. Enjoy free installation with local pick up!

Fennecvan Total Blackout Curtain Installation guide

Fennecvan Total Blackout Curtain Installation guide

Introduction

Our Total Blackout Curtain System is designed to provide complete privacy, light blockage, and improved temperature control inside your van. The system features a wraparound curtain track that follows the contour of the van, creating a clean factory-style appearance while maximizing blackout performance.

This installation requires basic hand tools and moderate DIY experience.

STEP 1 – TEST FIT RAIL LAYOUT

Assemble the long rail, two corner rails, and two short rails.

Position the rail assembly on your storage panel and verify the fit before drilling.

Make sure the curtain path is clear and the rail frame is properly aligned.

STEP 2 – MARK & DRILL MOUNTING HOLES

Place the assembled rail frame onto the storage panel and align it in the desired position.

Drill directly through the rails and into the storage panel to create the 7 mounting holes.

  • Long Rail: 3 mounting holes
  • Left Short Rail: 2 mounting holes
  • Right Short Rail: 2 mounting holes

Note: The rails are supplied without pre-drilled mounting holes. All mounting holes are drilled during installation.

⚠ Before drilling, ensure there are no wires, plumbing lines, or hidden components behind the mounting surface.

STEP 3 – INSTALL RAIL ASSEMBLY

Position the assembled rail frame over the drilled holes.

Install all 7 mounting screws through the rails into the storage panel.

Align the rail assembly, then tighten all screws evenly.

STEP 4 – INSTALL CURTAIN HOOKS & HANG CURTAIN

  1. Insert the 15 curtain hooks into the curtain header tape.
  2. Insert all 15 curtain rollers into the rail track.
  3. Connect each curtain hook to a curtain roller.

STEP 5 – INSTALL END CAPS & TEST OPERATION

Install the end caps on both ends of the rail system.

Slide the curtain around the entire track to verify smooth operation.

✔ Installation Complete.

Scroll to Top